Armdroid 1

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Saturday, 7 September 2013

Restringing - Part 3

Posted on 02:39 by Unknown
Final day of restringing....

Using the old string as a guide, cut two new lengths of string for the fingers - one is doubled up, the other single, and both feed into the tension equalizer:





This was the tricky bit...  Clamping the string into place with these grub-screws which had a nasty habit of spinning and pulling on the string...  at that same time, keeping an eye on the lengths to ensure they are even.



I found a steel rod helped keep things in place until tightening.    Ideally, you need two Allen Keys for locking these grub screws - you tighten one clockwise, the other is tightened anticlockwise, and should counteract things.   I only had one, and certainly was a struggle!

With the equalizer in place, I could now make a start on the remaining string which is the grip action cable.


The gripper cable starts from the rear drum (locked by grub screw),  feeding forward, before returning to the idler pulley next to the drum where it all started:


  
The double ended finger string should be hooked around the smaller pulley, but kept falling off without any tension - will be sorted later



The end of the string will be hooked onto the shoulder spring, so I have simply clipped this to keep in place until then.  Masking tape keeps the reduction gear from rotating, and also keeps excess string out of the way.


Arm ready for installation:




Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Disarming...
    I started stripping the arm down this morning...  After reading the construction instructions a couple of times  and plucking up some courag...
  • MIT M-Blocks
    I know, I know, my friends....  This has nothing whatsoever to do with Armdroids, but these self assembling cubes revealed today by MIT are ...
  • Pi's up!
    This morning, my eagerly waited for Raspberry Pi arrived... For those who don't already have one, this really is a Credit Card size sing...
  • The Base
    Removing the base would probably have been easier on models without sensors, but with a little persuasion, the board eventually came out: Th...
  • RPi Interfacing
    Progress report on the Raspberry Pi computer control & software A couple of evenings ago, decided to bite the bullet, and power up the A...
  • RPi GPIO & Armdroid Interface
    GPIO stands for General Purpose Input/Output, and a GPIO pin can be set to logic high, or low, with a value of 1 or 0 respectively.  The Ra...
  • RPi Interface - completed
    Today...  Assembled my interface cable allowing connection from the Raspberry Pi interface circuitry to the Armdroid's parallel interfac...
  • Rearming - Part 2
    Nothing is particularly easy...... Having reassembled the arm, I soon discovered a serious problem...  The forearm and shoulder joints was c...
  • Interface "How it works"
    In my last update, I explained how my Armdroid's circuit was identified as a prototype model. I'm going to now describe how this wor...
  • Quick update...
    I thought I'd better touch base and let you know what's happening here...  House redecorating is getting there, but unfortunately we...

Categories

  • Armdroid
  • Electronics
  • Raspberry Jam
  • Raspberry Pi

Blog Archive

  • ▼  2013 (40)
    • ►  November (3)
    • ►  October (9)
    • ▼  September (9)
      • Power Supply
      • Magnet Madness
      • Rearming - Part 2
      • Rearming - Part 1
      • Motor Pulleys - Upper & Fore arm
      • Restringing - Part 3
      • Restringing - Part 2
      • Restringing - Part 1
      • Cable Clamp Fabrication
    • ►  August (9)
    • ►  July (10)
Powered by Blogger.

About Me

Unknown
View my complete profile